Date: 3/5/2012
Objective:
- To do the project planning
- To identified what must do to finish the project
- To make sure the project run according to plan
Content:
The
time frame allocated for this research study is 10 months. It will start in
January 2012 and is projected to be completed in October 2012. The Gantt chart
for the project and its milestone are shown as in Table 1.
Practically,
reliability is often more difficult to specify than many major performance
characteristics and is certainly more difficult than most to measure. The
accurate assessment of the reliability of a product in use is often difficult
because of the long period needed or the large number of samples required in
order to gain statistical confidence in the assessment. In reliability
estimation, the failure rate models are approximations to reality. The failure
rate models are normally based on the best field data that could be obtained
for a wide variety of parts and systems. This data is then analysed, with many
simplifying assumptions applied, to create usable models. Thus, one should not
treat a reliability estimation numbers for the system as an absolute prediction
of field failure rate. Generally, it has been agreed that these estimations can
be very useful when used for relative comparison, such as comparing design
alternatives, or comparing products.
Prototype
of automatic car lock/unlock system for data centre application will be built
to enables the community to visualise the impact and application of the
proposed methods in determining the best solutions in solar tracking design
with respect to reliability and cost. This prototype will be presented in the
FYP Presentation Day.
Project Gantt Chart
First Semester
Second Semester
Analysis:
From the gantt chart, the first semester I concentrate on the research. Within the second semester I will start on buying until finishing the project.
Conclusion:
With this work plan that I have prepared, hope this project will run as plan and no problem while doing it. This is the importance on preparing the work plan, to make sure the project run as planned.